Skip to main content
Home
Pay My Bill
Outage Center
Maintenance Request
Menu
  • Home
  • Our Cooperative
    • Mission Statement
    • Owned By Members
    • Cooperative Principles
    • Bylaws
    • Board Of Directors
    • Annual Meeting
    • Regular Meetings of Board of Directors
    • Member Rights
    • Frequently Asked Questions (FAQs)
    • About Touchstone Energy Cooperatives
    • Careers
  • Get Connected
    • Existing Structure
    • Line Extension
    • Electric Line Easement
    • Installation Spec Sheets
    • Ag Exemption Requirement
  • Consumer Account
    • Pay My Bill
    • Update Contact Information
  • Member Services
    • Distributed Generation
    • Text Alerts
    • Energy Efficiency
      • Spring Energy Tips
      • Summer Energy Savings
    • Texas Coop Power
    • Together We Save
  • Reliability
    • Vegetation Maintenance
    • System Maintenance
    • Maintenance Request
  • Our Community
    • Safety
      • Storm Safety
    • Youth Tour
    • Scholarship
    • Community Resources

Line Extension

Line Extension

Contact our office to make an appointment.

 

Alysha Dies - Franklin Service Area

adies@navasotavalley.com

979-828-6428 or 800-443-9462 x6428

PO Box 848

Franklin, TX 77856

 

Kaylyn Barrett - Mart Service Area

kbarrett@navasotavalley.com

254-876-2581 or 800-445-8920

PO Box 60

Mart, TX 76664

 

Choose the appropriate installation for your power requirement in the links below.  All forms are necessary for line extensions.

 

Overhead Service

Overhead Service Through the Roof

200 Amp Underground Service

320 Amp Underground Service

 

Mail completed forms and a copy of the applicant and co-applicant's photo ID  to Navasota Valley.  We require all original documents with signature.

Pay Deposit and Fees - These can be paid in the offices or over the phone with a credit/debit card.  We accept Visa, MasterCard, and Discover.

$35 Membership Fee

$50 Connect/Transfer Fee

All residential applicants will be assessed a full deposit of $500.  This deposit can be lowered or waived when an applicant provides a social security number for the purpose of positive identification and risk assessment through a review of credit history.  All commercial applicants will be assessed a deposit of $200.  After paperwork is complete and fees are paid, construction may take up to 4 weeks from the time your meter pole is up, right-of-way is cleared and property is staked for service.  The weather may cause delays in construction.  We are careful not to damage your property and our equipment during wet conditions.

 

Back to Top

Quick Links

  • Contact Us
  • News
  • Privacy Policy

Contact Info

Navasota Valley Electric Co-Op

Address: 2281 US-79, Franklin, TX 77856

Phone: (979) 828-3232

Our Mission

To safely provide our members with electric service at the lowest possible cost, consistent with sound business practices.

We dare you to follow us

©2025 Navasota Valley Electric Cooperative, Inc. All Rights Reserved.

  • Home
  • Our Cooperative
    • Mission Statement
    • Owned By Members
    • Cooperative Principles
    • Bylaws
    • Board Of Directors
    • Annual Meeting
    • Regular Meetings of Board of Directors
    • Member Rights
    • Frequently Asked Questions (FAQs)
    • About Touchstone Energy Cooperatives
    • Careers
  • Get Connected
    • Existing Structure
    • Line Extension
    • Electric Line Easement
    • Installation Spec Sheets
    • Ag Exemption Requirement
  • Consumer Account
    • Pay My Bill
    • Update Contact Information
  • Member Services
    • Distributed Generation
    • Text Alerts
    • Energy Efficiency
      • Spring Energy Tips
      • Summer Energy Savings
    • Texas Coop Power
    • Together We Save
  • Reliability
    • Vegetation Maintenance
    • System Maintenance
    • Maintenance Request
  • Our Community
    • Safety
      • Storm Safety
    • Youth Tour
    • Scholarship
    • Community Resources